Airport Light Rail Publications
NOTE: Adobe® Reader® is required to view these files. This is a free download on the Adobe.com website. Some files may take a few minutes to download, due to file size.
The following publications on the Airport Light Rail project are available for download:
Reports and Studies:
- Airport TRAX Line Draft Environmental Study Report, February 2008
Supplement to the March 1999 Final Environmental Impact Statement (FEIS) for the Airport to University West-East Light Rail Project
Report Cover (PDF, 571 KB)
Introduction, Preface & Table of Contents (PDF, 47 KB)
Executive Summary (PDF, 226 KB)
Executive Summary Figures (PDF, 1.2 MB)
Chapter 1: Purpose and Need (PDF, 59 KB)
Chapter 2: Alternatives Considered (PDF, 111 KB)
Chapter 2 Figures (PDF, 1.4 MB)
Chapter 3: Environmental Effects (PDF, 371 KB)
Chapter 3 Figures (PDF, 1.8 MB)
Chapter 4: Traffic and Transportation (PDF, 258 KB)
Chapter 5: Public Involvement and Agency Coordination (PDF, 115 KB)
Chapter 6: Distribution List (PDF, 70 KB)
Chapter 7: List of Preparers (PDF, 28 KB)
Chapter 8: References (PDF, 30 KB)
Appendix A: Alternatives for Connecting for Westward Extension (PDF, 624 KB)
Appendix B: Preliminary Engineering Drawings (cover sheet only) (PDF, 16 KB)
[showhide Appendix B figures]
Drawing Title Sheet (PDF, 136 KB)
Drawing Key 1 (PDF, 90 KB)
Drawing Key 2 (PDF, 75 KB)
Drawing 1 (PDF, 3.5 MB)
Drawing 2 (PDF, 3.7 MB)
Drawing 3 (PDF, 3.7 MB)
Drawing 4 (PDF, 3.4 MB)
Drawing 5 (PDF, 3.3 MB)
Drawing 6 (PDF, 3.2 MB)
Drawing 7 (PDF, 3.4 MB)
Drawing 8 (PDF, 3.5 MB)
Drawing 9 (PDF, 3.7 MB)
Drawing 10 (PDF, 3.5 MB)
Drawing 11 (PDF, 3.4 MB)
Drawing 12 (PDF, 3.6 MB)
Drawing 13 (PDF, 3.5 MB)
Drawing 14 (PDF, 3.4 MB)
Drawing 15 (PDF, 3.5 MB)
Drawing 16 (PDF, 3.5 MB)
Drawing 17 (PDF, 3.8 MB)
Drawing 18 (PDF, 3.6 MB)
Drawing 19 (PDF, 3.6 MB)
Drawing 20 (PDF, 3.5 MB)
Drawing 21 (PDF, 2.4 MB)
Drawing 22 (PDF, 3.9 MB)
Drawing 23 (PDF, 3.5 MB)
Drawing 50 (PDF, 1.8 MB)
Drawing 51 (PDF, 1.9 MB)
Drawing 52 (PDF, 3.2 MB)
Drawing 53 (PDF, 2.8 MB)
- Airport to University West-East Light Rail Project, March 1999
Final Environmental Impact Statement (FEIS)
Report Cover (PDF, 306 KB)
Signature Pages (PDF, 53 KB)
Responsible Agencies (PDF, 26 KB)
Abstract (PDF, 55 KB)
Table of Contents (PDF, 690 KB)
Executive Summary (PDF, 1.2 MB)
Section 1: Purpose and Need (PDF, 1.7 MB)
Section 2: Alternatives Considered, Including Proposed Action (PDF, 2.3 MB)
Section 3: Affected Environment, 3.0 - 3.4 (PDF, 2.7 MB)
Section 3: Affected Environment, 3.5 - 3.10 (PDF, 4.9 MB)
Section 3: Affected Environment, 3.11 - 3.15 (PDF, 1.2 MB)
Section 4: Transportation Impacts and Mitigation Measures, 4.1 - 4.3 (PDF, 4.6 MB)
Section 4: Transportation Impacts and Mitigation Measures, 4.4 - 4.6 (PDF, 1.9 MB)
Section 5: Environmental Consequences, 5.1 - 5.4 (PDF, 4.1 MB)
Section 5: Environmental Consequences, 5.4 - 5.9 (PDF, 2.2 MB)
Section 5: Environmental Consequences, 5.10 - 5.19 (PDF, 2.8 MB)
Section 6: Financial Analysis and Evaluation (PDF, 2.2 MB)
Section 7: Public Involvement and Agency Coordination (PDF, 3.5 MB)
Section 8: List of Preparers (PDF, 236 KB)
- Airport to University West-East Light Rail Project, March 1999
Appendices to the Final Environmental Impact Statement (FEIS)
Appendices Front Cover (PDF, 422 KB)
List of Appendices (PDF, 17 KB)
Appendix A: Busway Analysis Report (PDF, 3.0 MB)
Appendix B: Evaluation of Light Rail Transit Alignment Options and Extensions (PDF, 4.6 MB)
Appendix C: West-East Corridor Wetland Delineation Report (PDF, 3.1 MB)
Appendix D: Noise and Vibration Data Sheets (PDF, 754 KB)
Appendix E: Air Quality Technical Report and Tier II CO Analysis (PDF, 3.2 MB)
Appendix F: Phase I Environmental Site Assessment (PDF, 1.9 MB)
Appendix G: Public Involvement Plan (PDF, 2.2 MB)
Appendix H: Technical Memorandum: Ridership Forecast for Special Generators (PDF, 2.0 MB)
Maps and Slides:
- Open House Information Boards and Maps, March 26, 2008 (PDF, 3 MB) *NEW*
- Presentation – Open House by Salt Lake City on October 18, 2007 (PDF, 2.8 MB)
- 1999 Alignment/Stations & 2007 Recommended Alignment/Stations Options (PDF, 1.2 MB)
- 1999 Decision - Locally Preferred Alignment & Stations (PDF, 2.4 MB)
- Changes Since 1999 Decision: Current & Future Land Use (PDF, 3.3 MB)
- 400 West without Transfer Station Option Analysis (PDF, 1.7 MB)
- 400 West with North Temple Transfer Station Option Analysis (PDF, 1.7 MB)
- 600 West Alignment Option Analysis (PDF, 1.7 MB)
- Option Eliminated from Further Consideration (PDF, 1.4 MB)
- Possible Station Locations (PDF, 2.2 MB)
- Possible Station Locations (2) (PDF, 2.2 MB)
- Possible Station Locations Options (PDF, 2.1 MB)
- General Public Comments & Next Steps (PDF, 472 KB)
Artist Renderings: